Sidewall Direct Venting; Sidewall Direct Venting Vent/Air Termination - Sidewall; Determine Location - Lochinvar Armor X2 AWN1000 Installation & Operation Manual

Table of Contents

Advertisement

4

Sidewall direct venting

Vent/air termination – sidewall
Follow
WARNING
determining vent location to avoid
possibility of severe personal injury,
death, or substantial property damage.
A gas vent extending through an exterior
WARNING
wall shall not terminate adjacent to a wall
or below building extensions such as eaves,
parapets, balconies, or decks. Failure to
comply could result in severe personal
injury, death, or substantial property
damage.

Determine location

Locate the vent/air terminations using the following guidelines:
1. The total length of piping for vent or air must not exceed
the limits given in the General Venting Section on page 17
of this manual.
2.
You must consider the surroundings when terminating
the vent and air:
a.
Position the vent termination where vapors will
not
damage
nearby
conditioning equipment or be objectionable.
b. The flue products will form a noticeable plume as
they condense in cold air. Avoid areas where the
plume could obstruct window views.
c.
Prevailing
winds
condensate and water/ice buildup where flue
products impinge on building surfaces or plants.
d. Avoid possibility of accidental contact of flue
products with people or pets.
e.
Do not locate the terminations where wind eddies
could affect performance or cause recirculation,
such as inside building corners, near adjacent
buildings or surfaces, window wells, stairwells,
alcoves, courtyards, or other recessed areas.
Sidewall vent and air inlet terminations
WARNING
must terminate in the same pressure zone.
f.
Do not terminate above any door or window.
Condensate can freeze, causing ice formations.
g.
Locate or guard vent to prevent condensate damage
to exterior finishes.
instructions
below
when
shrubs,
plants
or
could
cause
freezing
Installation & Operation Manual
Figure
4-1A
Termination of Air and Vent
Note: Available in 6"
diameter only.
FROM BOILER
VENT PIPE
CONNECTION
Table 4A CPVC/PVC Sidewall Vent Kits
Model
Kit Number
1.0 - 1.5
KIT30047
If using the alternate sidewall termination:
3. The air piping must terminate in a down-turned elbow
air
as shown in FIG. 4-1B.
recirculation of flue products into the combustion air
stream.
4. The vent piping must terminate in an elbow pointed
outward or away from the air inlet, as shown in FIG. 4-1B.
of
Do not exceed the maximum lengths of the
WARNING
outside vent piping shown in FIG.'s 4-1B
and 4-1C. Excessive length exposed to the
outside could cause freezing of condensate
in the vent pipe, resulting in potential water
heater shutdown.
Figure 4-1B Alternate Sidewall Termination of Air and
Vent w/Field Supplied Fittings
PVC/CPVC/Centrotherm Sidewall
TO BOILER
INTAKE AIR
CONNECTION
VENT / AIR
TERMINATION
GRADE OR
SNOW LINE
Vent Size
6 inch vent
This arrangement avoids
12"
MIN
TO
OVER-
HANG
12"
MIN
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents