Quarterly Maintenance Inspection Checklist - Data Aire LCS Installation, Operation And Maintenance Manual

6, 8, 10 and 13 ton air large ceiling systems (lcs), water and glycol cooled dx and chilled water
Table of Contents

Advertisement

Model No. _______________________
Prepared by: _____________________
Air Filters
____ Check for restricted air fl ow
____ Check fi lter differential switch
____ Wipe fi lter rack section clean
Blower Section
____ Blower wheel free of debris and moves freely
____ Check belt tension and condition
____ Bearings in good condition
____ Check air fl ow safety switch operation
____ Check pulleys and motor mounts
Air Distribution Section
____ Check for restriction in grille(s)
Compressor(s)
____ Check for leaks
Refrigeration Cycle/Section
____ Check for moisture (site glass)
____ Check suction pressure
____ Check discharge pressure
____ Check hot gas bypass valve operation
____ Check thermostatic expansion valve operation
____ Check solenoid valve operation
Air Cooled Condenser (if applicable)
____ Condenser coil clean
____ Motor mounts tight
____ Motor fan bearings in good condition
____ Refrigeration lines properly supported
____ Heated receiver site
Water/Glycol Fluid Cooler (if applicable)
____ Water regulating valve function
____ Check solution _____%
____ Check for water/glycol leaks (piping area)
____ Water/Glycol fl ow switch operational
Glycol Pump(s) (if applicable)
____ Glycol leaks (pump area)
____ Pump operation
____ Auto air vent clean of mineral deposits
Condensate Drain and Pump (if applicable)
____ Check for water leaks and restricted fl ow
____ Pump operation
Steam Generating Humidifi er (if applicable)
____ Check canister for deposits and water level
____ Check condition of steam hose and clamps
____ Check drain and fi ll valve for deposits
Data Aire, Inc.

Quarterly Maintenance Inspection Checklist

Reheat (if applicable)
Electrical Panel
Equipment Runtimes
Notes: _____________________________________
____________________________________________
____________________________________________
____________________________________________
____________________________________________
33
Serial No. ___________________________
Date:
___ / ___/ 200__
____ Check reheat element(s) for dust
____ Check high limit switch operation
____ Check fuses
____ Check contactor operation
____ Check all electrical connections
____ Check operation sequence
____ Check calibration of change over thermostat
(Energy Saver System Only)
Mini DAP control panel operations
____ Check calibration of temperature sensor (31*)
____ Check calibration of humidity sensor (35*)
* Mini DAP menu options
Blower
____________ hrs
Condenser
____________ hrs
Compressor(s)
____________ hrs
Reheat
____________ hrs
Humidifi er
____________ hrs
Dehumidifi cation
____________ hrs
Energy Saver
____________ hrs
____Reset all to read zero runtimes
Temperature/Humidity set at: _____° _____% RH

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LCS and is the answer not in the manual?

Table of Contents