Standard Horizontal Vent Terminations (Dual Pipe)
B
A
C
A
E
D
G
D
F
A. 24" (61 cm) maximum, 3"
D. 12" (30.5 cm) minimum to roof or
(7.6 cm) minimum
highest anticipated snow level
B. 12" (30.5 cm) minimum from
E. Combustion air intake
wall
F. Screen (optional)
C. Vent/flue tee
G. 45º or 90º medium radius elbow
Alternate Horizontal Vent Terminations (Dual Pipe)
B
A
C
H
G
F
D
E
A. 90º medium radius elbow
E. 12" (30.5 cm) minimum to roof or
highest anticipated snow level
B. Vent/flue pipe
F. Combustion air intake
C. 12" (30.5 cm) minimum
from wall
G. 24" (61 cm) maximum, 3" (7.6 cm)
minimum
D. Screen (optional)
H. 24" (61 cm) maximum radius
Standard Horizontal Terminations (Dual Pipe)—Above
Highest Anticipated Snow Level
C
B
D
A
H
F
E
E
G
A
A. Support straps
E. 12" (30.5 cm) minimum to roof or
highest anticipated snow level
B. 24" (61 cm) maximum, 3"
(7.6 cm) minimum
F. Screen (optional)
C. 12" (30.5 cm) minimum from wall
G. 45º or 90º medium radius elbow
D. Vent/flue tee
H. Combustion air intake
Alternate Horizontal Terminations (Dual Pipe)—Above
Highest Anticipated Snow Level
A
B
G
F
D
C
E
A. 45º or 90º medium radius
D. Combustion air intake
elbow
E. 12" (30.5 cm) minimum to roof or
B. Flue/vent pipe
highest anticipated snow level
C. 24" (61 cm) maximum, 3"
F. 24" (61 cm) maximum radius
(7.6 cm)
G. Screen (optional)
In a basement installation, the vent/flue pipe can be run
between joist spaces.
NOTE: If the vent pipe must go below a joist and then up into
the last joist space to penetrate the header, two 45° elbows
should be used to reach the header rather than two 90°
elbows.
Vent/Intake Terminations for Installation of
Multiple Direct Vent Furnaces
If more than one direct vent furnace is to be installed vertically
through a common roof top, maintain the same minimum
clearances between the exhaust vent and air intake terminations
of adjacent furnaces as with the exhaust vent and air intake
terminations of a single furnace.
If more than one direct vent furnace is to be installed horizontally
through a common side wall, maintain the clearances as shown
in “Horizontal Venting of Multiple Furnaces” illustration. Always
terminate all exhaust vent outlets at the same elevation and
always terminate all air intakes at the same elevation.
Horizontal Venting of Multiple Furnaces
A
B
B
F
C
F
G
D
H
E
A. 90º medium radius elbows
E. Screen (optional)
B. Flue/vent pipes
F. 24" (61 cm) maximum, 3"
(7.6 cm) minimum
C. 12" (30.5 cm) minimum
G. 3" (7.6 cm) minimum
D. 12" (30.5 cm) minimum to roof or
highest anticipated snow level
H. Combustion air intakes