Vent/Intake Terminations For Installation Of Multiple Direct Vent Furnaces; Concentric Vent Termination - Whirlpool WGFM195 Installation Instructions Manual

Hide thumbs Also See for WGFM195:
Table of Contents

Advertisement

Standard Horizontal Vent Terminations (Dual Pipe)
A
G
F
A. 24" (61 cm) maximum, 3"
(7.6 cm) minimum
B. 12" (30.5 cm) minimum from
wall
C. Vent/flue tee
Alternate Horizontal Vent Terminations (Dual Pipe)
H
A. 90º medium radius elbow
B. Vent/flue pipe
C. 12" (30.5 cm) minimum
from wall
D. Screen
Standard Horizontal Terminations (Dual Pipe)—Above
Highest Anticipated Snow Level
A
H
G
A. Support straps
B. 24" (61 cm) maximum, 3"
(7.6 cm) minimum
C. 12" (30.5 cm) minimum from wall
D. Vent/flue tee
20
B
A
C
E
D
D
D. 12" (30.5 cm) minimum to roof or
highest anticipated snow level
E. Combustion air intake
F. Screen
G. 90º medium radius elbow
B
A
C
G
F
D
E
E. 12" (30.5 cm) minimum to roof or
highest anticipated snow level
F. Combustion air intake
G. 24" (61 cm) maximum, 3" (7.6 cm)
minimum
H. 24" (61 cm) maximum radius
C
B
D
F
E
E
A
E. 12" (30.5 cm) minimum to roof or
highest anticipated snow level
F. Screen
G. 90º medium radius elbow
H. Combustion air intake
Alternate Horizontal Terminations (Dual Pipe)—Above
Highest Anticipated Snow Level
G
F
E
A. 90º medium radius elbow
B. Flue/vent pipe
C. 24" (61 cm) maximum, 3"
(7.6 cm)
In a basement installation, the vent/flue pipe can be run
between joist spaces.
NOTE: If the vent pipe must go below a joist and then up into
the last joist space to penetrate the header, two 45° elbows
should be used to reach the header rather than two 90°
elbows.
Vent/Intake Terminations for Installation of
Multiple Direct Vent Furnaces
If more than one direct vent furnace is to be installed vertically
through a common roof top, maintain the same minimum
clearances between the exhaust vent and air intake terminations
of adjacent furnaces as with the exhaust vent and air intake
terminations of a single furnace.
If more than one direct vent furnace is to be installed horizontally
through a common side wall, maintain the clearances as shown
in "Horizontal Venting of Multiple Furnaces" illustration. Always
terminate all exhaust vent outlets at the same elevation and
always terminate all air intakes at the same elevation.
Horizontal Venting of Multiple Furnaces
B
F
A. 90º medium radius elbows
B. Flue/vent pipes
C. 12" (30.5 cm) minimum
D. 12" (30.5 cm) minimum to roof or
highest anticipated snow level

Concentric Vent Termination

Refer to the directions provided with the Concentric Vent Kit
(DCVK) for installation specifications.
A
B
D
C
D. Combustion air intake
E. 12" (30.5 cm) minimum to roof or
highest anticipated snow level
F. 24" (61 cm) maximum radius
G. Screen
A
B
C
F
G
D
H
E
E. Screens
F. 24" (61 cm) maximum, 3"
(7.6 cm) minimum
G. 3" (7.6 cm) minimum
H. Combustion air intakes

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wfd195

Table of Contents