Installation Instructions - Heat & Glo ST-HVBI-AU Installation And Operation Instructions Manual

Table of Contents

Advertisement

1.0 INSTALLATION INSTRUCTIONS

When planning a heater installation, it's necessary to
determine:
• Where the unit is to be installed.
• The fl ue system confi guration to be used.
• Gas supply piping.
• Electrical wiring.
• Framing and fi nishing details.
12"
(306mm)
34-3/4 in.
(882mm)
4-1/16"
(102mm)
4-1/2"
(114mm)
FLUE COLLAR
Figure 1. Diagram of the ST-HVBI-AU
4
(132mm)
12"
(306mm)
Ø7-7/8"
(202mm)
Ø8"
(202mm)
ELECTRICAL
ACCESS
GAS LINE
ACCESS
42"
(1067mm)
2-1/4 in.
(58mm)
4-3/4 in.
(121mm)
TOP STANDOFFS
LOUVER
ACCESS
DOOR
GAS CONTROLS
& LABELS
GAS LINE
ACCESS
Heat & Glo • ST-HVBI-AU • 2082-900 Rev. J • 10/10
• Whether optional accessories—devices such as
wall switch, or remote control—are desired.
If the heater is to be installed on carpeting or tile, or on
any combustible material other than wood fl ooring, the
heater should be installed on a metal or wood panel
that extends the full width and depth of the heater.
5-1/4"
½"
(13mm)
46-5/8"
(1184mm)
9-11/16"
(245mm)
32-1/2 in.
(816mm)
36-3/16 in.
(919.3mm)
TOP
ELECTRICAL
ACCESS
17-15/16"
4-1/2"
(456mm)
(114mm)
2-9/16"
24 in.
(64mm)
(610m)
FLUE
COLLAR

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents