Preparations Before Installation; Indoor Unit Installation - Daikin FXLQ12MVJU Installation Manual

Vrv system inverter air conditioners
Hide thumbs Also See for FXLQ12MVJU:
Table of Contents

Advertisement

4.
PREPARATIONS BEFORE INSTALLA-
TION
(1) Positioning of holes for fastening to the wall
(2) How to open / close the front panel (FXLQ)
1. Open the lid of control panel (both left and right)
2. Remove screws (both left and right)
that lock the knobs in position.
3. Push the knobs (both left and right) to the rear.
4. Lift the front of the top plate.
5. Lower the front panel towards the front of the unit.
• To close, perform the procedure in opposite order. Pull
towards the front of the unit the knob snaps in place.
5.

INDOOR UNIT INSTALLATION

As for the parts to be used for installation work, be sure to use
the provided accessories and specified parts designated by
Daikin.
(1) Level the indoor unit with the leveling screws (7). If the
floor is too uneven to level the unit, place the unit on a
flat base and level.
(2) If the unit is in danger of falling over, either fasten to
the wall using the holes provided, or fasten to the floor
with an optional floor fastener.
(3) The legs can be retracted if the indoor unit is to be
hung on a wall. To do so, lift the legs as shown in the
figure below.
NOTE
1. Use the installation mount for installation. Check whether
the wall is strong enough to bear the weight of the unit or
not. if there is a risk, reinforce the wall before installing the
unit.
2. The unit requires a minimum 4 in. clearance on the under-
side for air intake. Also, ensure the unit is level when
installed so that drainage flows smoothly. if inclined, water
can leak.
3. By a state of the wall, operating sound may become bigger.
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fxnq18mvjuFxlq18mvjuFxlq24mvjuFxnq12mvjuFxnq24mvju

Table of Contents