Liebert CRH 004 Service Manual page 27

High performance air cooled chiller
Table of Contents

Advertisement

Fig. 5 --- Lifting instructions with tubes CRH/SRH 017---032
N.B:
Place the lifting tubes in the holes in the base indicated by the words "LIFT HERE". Lock the ends of the tubes in position with
the locking pins and split pins as shown above "A".
The capacity of the lifting gear must be adequate to lift the load in question. Check the weight of the unit, the capacity of the
lifting gear and ropes and the condition and suitability of the aforementioned equipment. Lift the unit with a speed suitable
for the load to be moved, so as not to damage the structure.
RIGID STRUTS
(POSSIBILY STEEL)
Lifting
Models
CRH 017 - 020 - 023 - 025 - 028 - 030 - 032
SRH 017 - 020 - 023 - 025 - 028 - 030 - 032
PROTECTION PLANK
BELTOR CHORD
BLOCKING PEG
(NOT SUPPLIED)
SPLIT PIN
(NOT SUPPLIED)
LIFTING TUBE
(NOT SUPPLIED)
(BASE HOLES Ø56)
24
"A"
"B"
"C"
(m)
(m)
1.0
1 0
' 5.5
5 5
' 9.0
(m)
9 0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents