Liebert CRH 004 Service Manual page 24

High performance air cooled chiller
Table of Contents

Advertisement

Fig. 3 --- Lifting instructions with tubes CRH/SRH 004---016
PART. "A"
LIFTING SYSTEM WITH TUBES
PART. "A"
N.B:
Place the lifting tubes in the holes in the base indicated by the words "LIFT HERE". Lock the ends of the tubes in position with
the locking pins and split pins as shown above "A".
The capacity of the lifting gear must be adequate to lift the load in question. Check the weight of the unit, the capacity of the
lifting gear and ropes and the condition and suitability of the aforementioned equipment. Lift the unit with a speed suitable
for the load to be moved, so as not to damage the structure.
Lifting
CRH / SRH 004 - 204 - 006 - 206
CRH / SRH 007 - 207 - 008 - 011
CRH / SRH 014 - 016
PROTECTION PLANK
RIGID STRUTS
(POSSIBILY STEEL)
BELT OR CHORD
BLOCKING PEG
(NOT SUPPLIED)
LIFTING TUBE
(NOT SUPPLIED)
(BASE HOLES Ø45)
SPLIT PIN
(NOT SUPPLIED)
Models
PART. "A"
"L "
(mm)
2006
3006
4006
21
"A"
"B"
"C"
(m)
(m)
1.7
' 3.5
' 8.5
1.7
' 4.5
' 8.5
1.7
' 4.5
' 8.5
(m)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents