Carrier 53KHET 12 Installation Manual page 38

Hi wall split air conditioners
Hide thumbs Also See for 53KHET 12:
Table of Contents

Advertisement

CONNECTING REFRIGERANT PIPING LINES (Cont.)
16-15 PUMPING DOWN (RE-INSTALLATION)
• INTRODUCTION
Pump down means collecting all the refrigerant in the system back into the outdoor unit.
Pump down must be actuated before disconnection of pipes, to avoid loss of refrigerant
gas. Pump down is used when the unit is moved to another installation location or when
the system is repaired.
Pumping down Procedure
(1) Confirm that both the 2-way liquid and 3-way gas valves are set to the open position.
• Remove the valve stem caps and confirm that the valve stems are in the open position.
• Be sure to use a hexagonal wrench to operate the valve stems.
(2) Operate the system for 10 to 15 minutes.
(3) Stop operation and wait for 3 minutes, then connect the charge set to the service port of the 3-way
gas valve.
• Connect the charge hose with the push pin to the gas service port.
(4) Air purging of the charge hose.
• Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
(5) Set the 2-way liquid valve to the close position.
(6) Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
(7) Immediately set the 3-way gas valve to the closed position.
• Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
(8) Disconnect the charge set, and mount the 2-way liquid and 3-way gas valve's stem nuts
and service port caps.
Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m (18 N.m)
Be sure to check for gas leakage.
36

Advertisement

Table of Contents
loading

Table of Contents