Toshiba RAS-16SKV2-E1 Service Manual page 97

Toshiba split type air conditioner service manual
Table of Contents

Advertisement

No.
Part name
Compressor
1) Perform work of item 1 of
2) Extract refrigerant gas.
3) Remove the partition board.
4) Remove the sound-insulation material.
5) Remove terminal cover of the compressor,
6) Remove pipe connected to the compressor
7) Remove the fixing screw of the bottom plate
8) Remove the fixing screw of the bottom plate
9) Pull upward the refrigeration cycle.
10)
ˆ
Reactor
1) Perform work of item 1 of
2) Remove screws fixing the reactors.
Procedure
.
(ST1TØ4 × 10L 3 pcs.)
and disconnect lead wire of the compressor
from the terminal.
with a burner.
• Take care to keep the 4-way valve away
from naked flames. (Otherwise, it may
malfunction.)
and heat exchanger. (ST1TØ4 × 10L 1 pc.)
and valve fixing plate.
(ST1TØ4 × 10L 1 pc.)
Remove NUT (3 pcs.) fixing the compres-
sor to the bottom plate.
(ST1TØ4 × 10L 4 pcs.)

ƒ
and
,
,
,
ƒ
, and
.
– 97 –
FILE NO. SVM-11029
Remarks
Partition
board
Compressor
Valve
fixing
plate
Reactor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-16sav2-e1

Table of Contents