Renault 2000 Espace Technical Note page 11

Table of Contents

Advertisement

Disconnect the lead from the engine compartment
connection unit; be sure to mark the location of the
various connections correctly.
Separate:
– a connector from the battery tray,
– the control solenoid valve from the turbocharger
regulation valve.
Fit hose pliers on the clutch master cylinder supply
pipe (on the brake fluid tank side).
Open the clutch slave cylinder bleed screw
(WARNING: you must use a counter-spanner at (C)
to compensate the effort of loosening/retightening
the bleed screw (A); see Technical Note 3345A).
ENGINE AND PERIPHERALS
Engine and transmission assembly
15583R
Disconnect:
Left side:
– the clutch slave cylinder high pressure union and
release the pipe from its clips,
– the water hoses connecting the engine to the tank
and the heater matrix element.
Right side:
– the diesel supply (1) and return (2) element from the
injection pump to the filter. It is essential that you plug
the openings with the appropriate plugs from kit
Part No.: 77 01 206 381,
– the inertia switch connector (3),
– the air conditioning circuit low pressure pipe on the
mounting bracket on the throttle body.
Under the vehicle:
– the booster pump connector; refit the electric wiring
harness to the engine.
10-7
10
18240-1M2
17527M1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents