Sym GTS 250 Service Manual page 116

Lm25w series
Hide thumbs Also See for GTS 250:
Table of Contents

Advertisement

Install new final shaft bearing and bearing puller
onto left crankcase.
Special tool:
Bearing puller 6205
Install assembly directs puller bearing puller.
Special Service Tools:
Assembly directs puller
Use screw driver holder bearing puller lower part,
and turn the bearing puller upper part to install the
final shaft bearing.
Apply with grease onto final shaft oil seal.
Install the oil seal into gear box cover.
Special tool:
Oil seal driver 34*52*5 SYM-9125500-HMA
To this chapter contents
SYM-9100400-6205
SYM-2341110
9. Final Driving Mechanism
Bearing puller 6205
Assembly
directs puller
Assembly
directs puller
Oil seal driver
9-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lm25w series

Table of Contents