Panasonic PV-GS19P Service Manual page 35

Digital video camcorder
Table of Contents

Advertisement

PV-GS19P / PV-GS31P / PV-GS32P / PV-GS35P / PV-GS19PC / PV-GS31PC / PV-GS34PC / PV-GS35PC
7. Installation of Main C.B.A.
Take care not to damage the F.P.C.s.
1) Connect the Zoom Switch F.P.C. to the Connector
FP10 on the Main C.B.A.
2) Connect the F.P.C.s to the connectors on the Main
C.B.A, verifying that the direction of the Flexible Cables
is correct. Refer to "REMOVAL/INSTALLATION OF
F.P.C. FROM NON ZIF (Zero Insertion Force)
CONNECTOR."
3) After installing the Main C.B.A., confirm the F.P.C.s are
positioned as shown.
Cylinder
F.P.C.
Head
Amp
Mechanism
F.P.C.
F.P.C.
Sub Mechanism
Capstan
Zoom
F.P.C.
F.P.C.
Switch
F.P.C.
Fig. D7
8. Installation of Mechanism Chassis Ass'y
Take care not to damage the F.P.C.s.
1) After installing the Mechanism Chassis Ass'y, confirm
the F.P.C.s are positioned as shown.
Mechanism Chassis Ass'y
Replacement of Mechanism Chassis Ass'y
When replacing the Main Chassis Ass'y or the Cylinder
Unit, be sure to perform the Envelope Output Adjustment.
Refer to "ENVELOPE OUTPUT ADJUSTMENT" in
MECHANICAL ADJUSTMENT.
Handling Caution of Mechanism Chassis Ass'y
When servicing the Mechanism Chassis Ass'y without the
Cassette Up Unit, do not handle the Sub Chassis of the
Mechanism Chassis Ass'y.
Mechanism Chassis Ass'y
(without Cassette Up Unit)
Sub Chassis
Sub Chassis
<Side View>
38
Fig. D8-1
Sub Chassis
Fig. D8-2

Advertisement

Table of Contents
loading

Table of Contents