IBM Power 720 Express 8202-E4B Installation Manual page 29

Hide thumbs Also See for Power 720 Express 8202-E4B:
Table of Contents

Advertisement

The following figure shows the parts of the cable-management arm in relative position to each other
before their assembly.
Figure 9. Relative positions of cable-management arm parts before assembly
1. The cable-management arm must be installed on the right side of the server, when you are facing it
from the rear. The following figure shows it being installed on the right side. Connect one end of the
support arm (1) to the right slide rail so that you can swing the other end of the support arm (2)
toward the left side of the rack.
Figure 10. Support arm connection
2. Locate the hole at the bottom inside corner of the L-shaped cable-management stop bracket (1).
Position the unattached end of the support arm so that the locking tab on the underside of its tip
2
Cable-management stop bracket
3
Mounting bracket
4
Cable-management arm
Installing the server into a rack
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

8205-e6bPower 720 expressPower 740 express

Table of Contents