Table 1. Tasks to install the deskside server (continued)
Task
Install the front cover door
To install the rack-mounted 8202-E4B and 8205-E6B, perform the following high-level tasks:
4
Power Systems: Installing the IBM Power 720 Express (8202-E4B) and IBM Power 740 Express (8205-E6B)
Where to find associated information
The following pictures describe how to install the front
cover door.