Toshiba RAS-10N3AV2-A Service Manual page 66

Split type
Table of Contents

Advertisement

<Shaping pipes>
Fig. 10-4-8
1. How to shape the pipes. Shape the pipes along
the incused line on the outdoor unit.
2. How to fit position of the pipes. Put the edges of
the pipes to the place with a distance of 85 mm
from the incused line.
10-4-4. Evacuating
After the piping has been connected to the indoor unit,
you can perform the air purge together at once.
AIR PURGE
Evacuate the air in the connecting pipes and in
the indoor unit using a vacuum pump.
Do not use the refrigerant in the outdoor unit.
For details, see the vacuum pump manual.
<Use a vacuum pump>
Be sure to use a vacuum pump with counter-flow
prevention function so that inside oil of the pump does
not flow backward into pipes of the air conditioner when
the pump stops. (If oil inside the vacuum pump enters
the air conditioner, which use R410A,
refrigeration cycle trouble may result.)
1. Connect the charge hose from the manifold valve
to the service port of the packed valve at gas side.
2. Connect the charge hose to the port of the
vacuum pump.
3. Open fully the low pressure side handle of the
gauge manifold valve.
4. Operate the vacuum pump to start evacuating.
Incused line
5. Close the low pressure side valve handle of the
6. Open fully the valve stem of the packed valves
7. Remove the charging hose from the service port.
8. Securely tighten the caps on the packed valves.
– 65 –
FILE NO. SVM-13001
Perform evacuating for about 15 minutes if the
piping length is 20 meters (15 minutes for 20
meters) (assuming a pump capacity of 27 liters
per minute).
Confirm that the compound pressure gauge
reading is –101 kPa (76 cmHg).
gauge manifold valve.
(both sides of Gas and Liquid).
Compound pressure gauge
− 101 kPa (− 76 cmHg)
Handle Lo
Charge hose
(For R410A only)
Connecting pipe
Packed valve at gas side
Service port
(Valve core (Setting pin))
Packed valve at liquid side
Fig. 10-4-8
CAUTION
KEEP IMPORTANT 5 POINTS FOR PIPING WORK
(1) Take away dust and moisture (Inside of the
connecting pipes.)
(2) Tighten connection (between pipes and unit)
(3) Evacuate the air in the connecting pipes using
VACUUM PUMP.
(4) Check gas leak (connected points)
(5) Be sure to fully open the packed valves
before operation.
Pressure gauge
Manifold valve
Handle Hi
(Keep full closed)
Charge hose
(For R410A only)
Vacuum pump
adapter for
counter-flow
prevention
(For R410A only)
Vacuum
pump

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents