Unpacking an Enclosure and Verifying its Contents

This section provides a list of contents in an enclosure package.
Caution –
injury. An enclosure with all drives installed can weigh 65 pounds (29.5 kilograms).
1. Unpack the enclosure.
2. Check the contents of the enclosure and box for the items listed in Table 2-1.
Table 2-1 Contents of an Enclosure Package
Item
Enclosure ordered
• R/Evolution 2730 FC Controller Enclosure
• R/Evolution SAS Expansion Enclosure
6-foot (1.83 m) power cord
Controller enclosure only:
• SFP transceivers
• 16.4-foot (5 m) shielded CAT-5 Ethernet crossover
cable
• 6-foot (1.83 m) serial cable, RS-232 micro-DB9
Drive enclosure only:
• 1.9-foot (0.6 m) SAS-to-SAS cascading cable
Purchased options. These options are ordered at the time
of purchase and are integrated into or added to the
system prior to delivery.
1 The enclosure includes 1 or 2 controller or expansion modules, as ordered.
2 You may need to order additional or longer cables if you are cabling a fault-tolerant configuration.
Two people are needed to lift and move the enclosure. Use care to avoid
1
; either:
Quantity
1 or 2
2 per enclosure
1 per host port
1 with second controller
module
1 per controller module
2
1 per expansion module
Various
Chapter 2 Installing and Cabling Enclosures
25

Advertisement

Table of Contents
loading

Table of Contents