Installation Of Indoor Units - Midea MFA-96CRN1 Technical Manual

Hide thumbs Also See for MFA-96CRN1:
Table of Contents

Advertisement

MCAC-UTSM-2012-12

2. Installation of Indoor Units

2.1 Installation of Duct
2.1.1 Installation Space
Ensure enough space required for installation and maintenance. (Fig-1 and Fig-2)
Electric control box
Inspection hole
2.1.2 Install Φ10 Pendant Bolts Or Ground Bolts (Fig-3)
1. Use f10 or bigger screws. The screw material is high-quality carbon steel (whose surface is zinc plated or
undergoes other rustproof treatment) or stainless steel.
2. The treatment of the ceiling varies between buildings. For detailed measures, consult with the fitting-out
staff.
3. Fix the pendant bolts firmly and reliably in light of the specific situation.
4. Installation of the pendant bolt in different environments.
Fig-1
Fig-3
R410A 50Hz Tropical Split AC
Fig -2
MTA-76C(H)RN1
MTA-96C(H)RN1
MHB-76C(H)RN1
MHB-96C(H)RN1
MTA-120C(H)RN1
MTA-150C(H)RN1
121

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents