Measure The Gas Inlet Pressure; (Working Pressure); Check And Adjust The Gas/Air Ratio; Carry Out A Leakage Test In Operating - Buderus Logamax plus Installation Instructions Manual

Gb162-80 kw/100 kw condensing gas boiler
Hide thumbs Also See for Logamax plus:
Table of Contents

Advertisement

11
Inspection
11.5 Measure the gas inlet pressure (working pressure)
See paragraph 9.7: "Measure the gas inlet pressure
(working pressure)" on page 50.

11.6 Check and adjust the gas/air ratio

See paragraph 9.8: "Check and adjust the gas/air ratio" on
page 52
11.7 Carry out a leakage test in operating conditions
See paragraph 9.9: "Carry out a leakage test in operating
conditions" on page 54.

11.8 Measure the flue gases CO emissions

See paragraph 9.10: "Measure the flue gases CO emis-
sions" on page 55.

11.9 Fill the heating system

To ensure a trouble free operation of your boiler you must to
check the pH-value every year and correct if necessary.
See accompanying manual about water quality for more
information.
See paragraph 9.2: "Fill the heating system" on page 47.

11.10 Check the air/flue gas connection

See paragraph 9.5: "Check the air/flue gas connection" on
page 49.
64
Logamax plus GB162-80 kW/100 kW - Subject to modifications resulting from technical improvements!

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents