Water heat exchange unit
(1) Installation fixing position and center of gravity position
1Position of center of gravity
Outdoor unit
type
WE80 type
WE170 type
2Anchor bolt calculations
●Evaluation by calculation
1
Foundation bolt conditions
Total no. of bolts(N
bolt diameter(D
bolt cross-sectional area(A
bolts on one side short direction(n
The installation method is "embedded J type, JA type bolts", on a slab 15cm thick.
Foundation bolt allowable short term tensile load(T
(It is also acceptable to decide the installation method after completing the calculation
2
Calculation
Design horizontal magnitude(K
Operating load(W
(=operating mass×9.8
Horizontal earthquake force(F
Height of center of gravity(h
Vertical earthquake force(F
Left side view
G
h
G
l
G1
l
1
Position of fastenings
l
l
1
2
1,040
460
1,040
460
)
)
)
)
1
long direction(n
)
H
)
)
)
H
)
)
V
8. Position of center of gravity and earthquake resistance calculation
Front view
h
G
l
2
Position of center of gravity
l
l
G 1
G 2
N =
4
No.
...........current models have 4 bolts
D =
10
mm ...........for M10 bolts
π
2
A = D
/4 =
79
mm
n
= 2
...........current models have 2 bolts
No.
1
)
n
= 2
No.
...........current models have 2 bolts
2
2
)
T
=
a
a
K
= 1.0
...........installation location:K
H
on ground:0.4
W =
N
F
= K
W=
N
H
H
h
=
mm
G
F
=F
/2=
N
V
H
H - 24
G
l
G2
Product
mass
h
(kg)
G
2
4 ,508 N
)
on roof: 1.0
H