ADE
Note: The mounting configuration may vary depending on the factors
discussed (e.g.: location, pole selection). When mounting the bracket
ensure:
The M10 bolts have 15 – 20 mm thread engagement into the ADE
The ADE / BDE cable can be connected to the connector in the
center of the ADE.
The vent on the ADE is not covered
It is also advisable to have the labels visible after mounting.
To mount the bracket to the ADE:
Important! Due to the weight of the ADE it is recommended that two
people work together to maintain balance when lifting and
positioning the unit for assembly or placement.
a .
Connect the ADE / BDE cable to ADE. If necessary, thread the cable
through the mounting pipe.
b .
Screw the M10 bolts into the ADE
5 .
Fasten mounting bracket to mounting pole.
Note: If required, fit earthing strap between ADE grounding point and
vessel superstructure.
The ADE provides a grounding connection for enhanced protection from
lightning induced transients, connection is not required in terms of user
safety or protection of the ADE from the telephone network (as this is
provided in the BDE). The use of this connection must be considered as
part of the overall grounding and lightning protection scheme for the
vessel as a whole.
If used, serrated washers should be fitted on either side of the cable lug
(note: installer provided), so that one is under the head of the M10 bolt
and one is against the metal base plate. Silicone grease or joint compound
should be applied between all contact surfaces, and an impervious
coating should then be applied over the whole joint to exclude moisture
from all metal surfaces, e.g. using self-amalgamating tape or a shrink-fit
rubber boot.
Iridium Openport Terminal
I
4 Installation
4.7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9701

Table of Contents