PIAGGIO 500 cc Service Manual page 181

Engine 500 cc 4-stroke 4-valve
Table of Contents

Advertisement

NO
The coil circuit control is
efficient.
Proceed with secondary
control of the della HV coil,
cable and shield cover
(see page 9-68 and 9-72)
Measure the tension between pins 20 and 23 of the
special tool during the fuel pump timing phase.
To activate timing set to "ON" with switch on "RUN"
and side stand raised.
20-23 = Battery tension (matched with pump
revolution - 2 sec.)
If an increased time available for the test is desired,
activate the "relay pump diagnosis" function
(30 seconds)
YES
The coil primary control circuit is efficient.
Check the connections with the control unit
and coil accurately.
If necessary proceed with replacement of the control unit.
Disconnect the connection with the HV coil primary
Repeat the tension control between the black-green
wire and the earth.
Black-green-23 = battery tension
(matched with pump revolution -2 seconds)
YES
YES
Install the connection harness between the control unit and fuel injection
Special tool 020481Y (see page 9-8)
Check continuity of the black-green wire.
NOTE: any anomaly of the command electromagnetic switch would
lead to failed pump turning. (see page 9-53)
NO
Repair or replace the harness.
Fuel injection
NO
9
9 - 69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

X9

Table of Contents