Wiring diagram Accessory unit
To Control cabinet
To Control cabinet
Do1: Starting additional heat (oil-Þ red boiler/electric element) heating system.
PLEASE NOTE: Maximum relay output load, 1800W resistive, 600W inductive,
ϕ
cos
>0,4. At greater loads, an intermediate relay must be installed, not
included.
H1:
Any additional heat alarms. Closing during operation causes alarm Fault on
additional heat heating system.
Q2:
Mixing valve.
S4:
Switch emergency operation (starting oil-Þ red boiler/electric element)
Function Emergency operation:
Switch S3 on the control cabinet starts the heating system's pump G3 and
heat carrier pump G2.
Switch S4 on the accessory unit is used for starting the oil-Þ red boiler or the
electric element.
If the emergency operation function is to be used, the pre-installed cables
from switch S4 must be connected to the OPB circuit board according to wiring
diagram (L and Do1).
NOTE! An electric element must have overheat protection with built-in
thermostat.
25
Connecting to the power supply
Strap
S1 must be in "Term" position on
the Þ rst and last circuit board in
the CANbus loop.