Installing Vent Pipe; Assembly Of Vent Sections - Heat & Glo SOHO24B Owner's Manual

Hide thumbs Also See for SOHO24B:
Table of Contents

Advertisement

8 8

Installing Vent Pipe

A. Assembly of Vent Sections
WARNING
Fire Risk
Exhaust Fumes Risk
Impaired Performance of Appliance
• Ensure vent components are locked
together correctly.
• Pipe may separate if not properly joined.
Attach the First Vent Component to Starting Collars
To attach the fi rst vent component to the starting collars
of the appliance:
• Lock the vent components into place by sliding the
concentric pipe sections with four (4) equally spaced
interior beads into the appliance collar or previously
installed component end with four (4) equally spaced
indented sections.
• When the internal beads of each outer pipe line up, rotate
the pipe section clockwise about one-quarter (1/4) turn
(see Figure 8.1). The vent pipe is now locked together.
• Slide the ceramic fi ber pad over the fi rst vent section
and place it fl ush to the appliance. This will prevent cold
air infi ltration. High temp caulk may be used to hold the
part in place. Continue to add vent components.
Commercial, Multi-family (Multi-level exceeding two
stories), & High-Rise Applications
For Installation into Commercial, multi-family (multi-level ex-
ceeding two stories) or high-rise applications: All pipe joints
must be sealed with high temperature silicone, including the
slip section that connects directly to the horizontal termina-
tion cap.
• Apply a bead of silicone sealant inside the female outer
pipe joint prior to joining sections.
• Only outer pipes are sealed. Do not seal the inner fl ue.
All unit collar, pipe, slip section, elbow and cap outer fl ues
shall be sealed in this manner, unless otherwise stated.
Note: The end of the pipe sections with the lances/tabs on
it will face toward the appliance.
WARNING
Fire Risk
Explosion Risk
If slip section seals are broken during the
removal of the termination cap, gas will leak and
a fi re or explosion may occur.
Do not break silicone seals on slip sections.
20
Continue Adding Vent Components
• Continue adding vent components, locking each
• Ensure that each succeeding vent component is securely
• 90° elbows may be installed and rotated to any point
Figure 8.1 Adding Venting Components
Install Support Brackets
For Horizontal Runs - The vent system must be supported
every fi ve (5) feet of horizontal run by a horizontal pipe
support.
To install support brackets for horizontal runs:
• Place the pipe supports around the vent pipe.
• Nail the pipe supports to the framing members.
For Vertical Runs - The vent system must be supported
every eight (8) feet (2.4 m) above the appliance fl ue outlet by
wall brackets. To install support brackets for vertical runs:
• Attach wall brackets to the vent pipe and secure the wall
Heat & Glo • Soho24B • 2137-900 Rev. E • 11/07
succeeding component into place.
fi tted and locked into the preceding component.
around the preceding component's vertical axis. If an
elbow does not end up in a locked position with the
preceding component, attach with a minimum of two (2)
sheet metal screws.
bracket to the framing members with nails or screws.
WARNING
Fire Risk.
Explosion Risk.
Combustion Fume Risk.
Use vent run supports per installation
instructions.
Connect vent sections per installation
instructions.
• Maintain all clearances to combustibles.
• Do NOT allow vent to sag below
connection point to appliance.
• Maintain specifi ed slope (if required).
Improper support may allow vent to sag or separate.