Installation; Unpacking The Switch; Package Contents; Unpacking Steps - Dell Force10 S4820T System Getting Started Manual

Hide thumbs Also See for Force10 S4820T System:
Table of Contents

Advertisement

Installation

Unpacking the Switch

Package Contents

When unpacking each switch, make sure that the following items are
included:
One S4820T switch
One RJ-45 to DB-9 female cable
Two sets of rail kits (no tools required)
One PSU
One AC power cord (country/region specific)
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement

Unpacking Steps

Before unpacking the switch, inspect the container and immediately
NOTE:
report any evidence of damage.
Step
Task
Place the container on a clean, flat surface and cut all straps securing the
1
container.
Open the container or remove the container top.
2
Carefully remove the switch from the container and place it on a secure and
3
clean surface.
Remove all packing material.
4
Inspect the product and accessories for damage.
5
11
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents