Plan The Belowdecks Installation - KVH Industries M5 Installation Manual

Switchplate configuration
Table of Contents

Advertisement

Plan the Belowdecks Installation

3
Consider the following installation guidelines for
the belowdecks equipment:
• Select a switchplate mounting location in a
dry, well-ventilated area belowdecks away
from any heat sources or salt spray.
• Be sure to leave enough room at the
switchplate's rear panel for connecting the
cables and maintaining a service loop (see
Figure 6 for switchplate dimensions).
• The supplied data cable is 50 ft (15 m) long.
Be sure to locate the switchplate close enough
to the antenna for the cable to reach, while
allowing adequate slack for a service loop.
• (Circular and Sky Mexico only) The
grounding block should be located within
45 ft (13 m) of the antenna, within 5 ft (1.5 m)
of the primary receiver, and within 25 ft
(7.6 m) of a suitable vessel AC ground.
Prepare the Switchplate Mounting Site
Once you have identified a suitable switchplate
mounting site, follow these steps to prepare the
site for installation.
NOTE: If you prefer, you may install the switchplate
within a standard electrical panel instead.
a. Using the switchplate mounting template
provided at the end of this manual, mark and
cut out a hole in the mounting surface to
accommodate the switchplate (see Figure 7).
b. Using the same template, mark the locations
for the four switchplate mounting holes.
c. Drill a 3/32" (2.25 mm) hole at the four
mounting hole locations. Later, you will
mount the switchplate using four #6 screws.
Figure 6: Switchplate Dimensions
Figure 7: Switchplate Mounting Holes Layout
3.82"
(97 mm)
.32" (8 mm)
2.36"
Panel Cutout
(60 mm)
3.19"
.16" (4 mm)
(81 mm)
Top View
2.16"
(54.9 mm)
Front View
2.96"
(75.2 mm)
3/32" ( 2.25 mm)
Mounting Hole (x4)
2.05"
(52 mm)
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tracvision m5

Table of Contents