Chamberlain GS400D Owner's Manual page 27

Residential gate operator
Table of Contents

Advertisement

JUNCTION BOX
2
The following items are required to complete the junction box installation:
• 4 x 4 Junction Box with 3/4 NPT holes
• Screws
• PVC Conduit
Open junction box by removing screws (4) and set aside.
Mount junction box within 5' of second operator.
Screws (4)
Control Box
Within 5'PVC conduit (not provided) to protect
the power cable and low voltage wire from
lawn mowers and string trimmers.
Junction Box Cover
us e
n Ca
Ca
te
at h
Ga
De
ve at
any
in g
or
y mo
M ov
In ju
ry
te ma
ng .
e or
R! Ga
wa rni
gat
pri or
te the
CL EA
ho ut
op era
KE EP
ldr en
ly
ce
e wit
let chi
a.
s on
te ent
ran
tim
no t
e are
icle
Do
in the
gat
for
veh
sep
ara
pla y
ce is
st use
ran
ns mu
Th is
ent
tria
Pe des
Gate Operator (Gate 1)
27
Within 5'
Junction Box
Gate Operator (Gate 2)
Junction Box
(not provided)
Extension Cable
Wiring

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ga420d

Table of Contents