Reference to Figure 10.2.1b - Insulation should be
folded around boiler such that its rear edges meet in
the centre. Ensure flow and return connections are
clear and unobstructed.
Figure 10.2.1b
Apply foil tape down join. Leave 'petals' in upright
position at the sides for installation of secondary
heat exchanger insulation. Mould the rear 'petal'
into the shape of the boiler and fold the front 'petal'
such that the access door is not covered. Use foil
tape to secure joins and folds whilst ensuring gas
pipe bracket and thermostat pocket are clear and
unobstructed.
10.2.2 Secondary Heat Exchanger Insulation
Refer to Figure 10.2.2a - Offer insulation jacket to
transition duct as shown. Ensure insulation is not
snagged or ripped by any sharp objects.
Figure 10.2.2a
HAMWORTHY HEATING LTD
Refer to Figure 10.2.2b - Fit jacket over the
transition duct and secondary heat exchanger.
Ensure the two air vents protrude through the jacket.
Feed jacket between the two M6 studs, which will
eventually hold the casing support bar.
Figure 10.2.2b
Refer to Figure 10.2.2c - Close flaps around bottom
of secondary heat exchanger.
completely covered. The insulation jacket should
not cover the stainless steel collector hood.
Figure 10.2.2c
Figure 10.3a
Seal all joints with tape provided. Loosely close the
front flaps covering the inspection door. Place two
pieces of tape on front split to allow access to the
inspection door.
17
WARMWELL
Ensure unit is
500001091/F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Warmwell 80Warmwell 120Warmwell 95Warmwell 140

Table of Contents