Pioneer DV-PT100-S Service Manual page 96

Dvd player & vcr
Table of Contents

Advertisement

1
2-14: CAPSTAN DD UNIT (Refer to Fig. 2-14)
1. Remove the Capstan Belt.
2. Remove the screw 1.
3. Remove the Capstan Holder.
A
4. Remove the 3 screws 2.
5. Remove the Capstan DD Unit.
B
2
2 2
Screw Torque: 4 ± 0.5kgf•cm
C
2-15: MAIN CAM/PINCH ROLLER CAM/JOINT
GEAR (Refer to Fig. 2-15-A)
1. Remove the E-Ring 1, then remove the Main Cam.
2. Remove the E-Ring 2, then remove the Pinch Roller
Cam and Joint Gear.
1
D
E
NOTE:
1. In case of the Pinch Roller Cam and Main Cam
installation, install them as the circled section of Fig.
2-15-B so that the each markers are met.
(Refer to Fig. 2-15-B)
F
96
1
2
Capstan Belt
1
Capstan Holder
Capstan DD Unit
Fig. 2-14
Main Cam
2
Pinch Roller Cam
Joint Gear
Fig. 2-15-A
2
3
Pinch Roller Cam
Marker
Main Cam
2-16: LOADING GEAR S/T UNIT
(Refer to Fig. 2-16-A)
1. Remove the E-Ring 1 and remove the Main Loading
Gear.
2. Remove the Main Rod, Tension Lever, Loading Arm S
Unit and Loading Arm T Unit.
Main Rod
Tension Lever
NOTE:
1. When you install the Loading Arm S Unit, Loading Arm T
Unit and Main Loading Gear, align each marker.
(Refer to Fig. 2-16-B)
Main Loading Gear
Marker
Loading Arm T Unit
DV-PT100-S
3
4
Fig. 2-15-B
1
Main Loading Gear
Loading Arm T Unit
Loading Arm S Unit
Fig. 2-16-A
Marker
Loading Arm S Unit
Fig. 2-16-B
4

Advertisement

Table of Contents
loading

Table of Contents