Operator Installation - Vector V400 Installation Manual

Swing gate automation
Table of Contents

Advertisement

Operator Installation

Operator Installation
1. Determine gate opening angle and direction of
operator (inward or outward).
Alternatively the swing angle can be deter-
mined more accurately with the process
detailed on page 37.
2. Determine a suitable height for the wall
bracket.
The gate bracket must fit to a sturdy point on
the gate.
Consider using the optional gate adaptor kit.
3. Determine where to put the bracket according
to A and B values in the tables on pages 23 and
25.
.
OPERATOR MUST NOT FOUL AGAINST BRACKET
Take care to shorten
the wall bracket to
prevent interference
with the operator
CAUTION:
USE MECHANO KIT
120°
110°
100°
A
B
or
or
Page 18
CLOSED
60°
70°
90° 80°
G at e B racket
For tables see page 23 or 25
CUT THE BRACKET
Gat e openi ng angl e
120°
60°
100°
70°
110°
90° 80°
Gat e openi ng angl e
120°
60°
70°
100°
110°
90° 80°

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V500

Table of Contents