Dickinson SEA-B-QUE LARGE Operator's Manual page 5

Propane barbecue
Hide thumbs Also See for SEA-B-QUE LARGE:
Table of Contents

Advertisement

Low pressure Retrofit
The control on the Sea-b-Que will need to be changed to a low pressure control (#15-
193), and a low pressure (11" water column) regulator (#19-151) needed for the propane
tank.
Cooking
The removable drip tray must be installed prior to cooking.
build-up in the grease tray or in the base of the sea-b-que. The porcelain enamel cooking
surface plates should be sprayed or covered with cooking oil to prevent food from
sticking. Accumulated grease will burn off if the cooking plates are turned over.
Diagrams
Diagram B
#8 x 3/8 screws & #8 nuts
#10 x ¾ screws
#8 x 3/8 screw & nut
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Igniter
Diagram D
Handles
Diagram C
Burner
Do not allow grease to
Diagram A
Lower Assembly
#10 nuts
#10 L'washers
Diagram E
Thermometer
#6 x ¼ screws
Igniter

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sea-b-que small

Table of Contents