Potterton Promax HE Store Installation & Servicing Instructions Manual page 55

Promax he store series condensing boilers with integrated hot water storage
Table of Contents

Advertisement

H
1.
Check the gas supply pressure:
For Natural Gas greater than
10 - 11 mbar
2.
Check and correct if necessary
1. The mechanical set of the gas valve
(CO2 values - see instruction)
2. Flame sensing electrode and lead connections
3. Flame sensing electrode position
Flame current should be more than 0.5 A
I
1.
Overheat thermostat operated
or faulty, i.e. continuity across
thermostat terminals
YES
J
Is there 230V at:
1.
Motor 3-way valve
2.
PCB - X3 connector terminals
5 & 6 central heating mode
5 & 7 domestic hot water mode
YES
Change pump supply cable
K
1.
Fan connections correct at fan.
PCB - X401 connector terminals 5,6,7 & 8
L
1.
Temperature sensors faulty.
Cold resistance approximately
10k @ 25° C (CH sensor)
20k @ 25° C (Flue sensor)
(resistance reduces with increase in temp.)
2.
If pump is running the heat exchanger could
be obstructed
© Baxi Heating UK Ltd 2012
Allow to cool. Continuity
NO
across thermostat terminals
more than 1.5 ohm
Replace PCB
YES
NO
YES
NO
YES
YES
Replace PCB
NO
Replace flame sensing electrode
YES
Replace diverter valve actuator
Replace PCB
Replace fan
Replace sensor
Replace heat exchanger
Replace safety thermostat
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents