Roberts Gorden AG15ST Installation, Operation & Service Manual page 24

Vacuum assisted linear and double linear gas fired heating systems blackheat ag
Table of Contents

Advertisement

®
B
AG I
LACKHEAT
NSTALLATION
Step 6.4.1 Coupling and Tube Assembly (Continued)
Tighten slide bar as shown below.
Correct Slide Bar
dimensions
• Repeat Step 6.4 A - D until all tubes are assembled. See Page 18, Section 6.4.2 shown below.
Step 6.4.2 Coupling and Tube Assembly (Continued)
2290 mm
± 250 mm
18
O
S
PERATION AND
ERVICE
Drive slide bar until tight.
End of slide bar should be
within tolerance listed below.
± 50 mm
3050 mm Typ
± 250 mm
M
ANUAL
Incorrect Slide Bar
position
Model
AG15ST
AG20ST
AG25ST
AG30ST
AG35ST
AG40ST
AG45ST
AG50ST
AG55ST
Total Overall
Tube Length
Overall Tube Length (mm)
6000
9000
9000
12,000
12,000
12,000
15,000
15,000
18,000
Weld spot
at end of
heat exchanger
Number
of Tubes
2
3
3
4
4
4
5
5
6

Advertisement

Table of Contents
loading

Table of Contents