Minimum
clearances
materials:
1" (25mm) to either side.
Reduced to 15mm stops at rear
36" (915mm) above
48" (1220mm) to front (see figs.4&5)
Fig.4

REDUCED CLEARANCES

Where the flue passes through a combustible
material a twin wall solid packed insulated chimney
connector must be used and must come flush with
the outer surface of the material and run all the way
to the masonry chimney or to the point of termination
of the factory made chimney (See Fig.6).
to
non-combustible
Fig.5
Fig. 6
If the cooker is to be installed against combustible
material (e.g. cabineting or wall panelling) a panel of
1 /2
12mm (
") thickness non-combustible insulation
board the size of the appliance must be fitted
between the cooker and the combustible material.
The insulation board used must not contain
asbestos or ceramic. (See Figs. 7 & 8)
The clearances for non-combustible materials can
then be observed (see Fig.4)
An optional hob filler strip can be fitted between the
Stanley and adjacent units. Refer to fig.7.
Fig.7
Fig.8