WARNING: Qualified Service Personnel ONLY must perform the Installa- system for the maximum safety and performance. Included is information on tion and Servicing of these Battery Packs. MINUTEMAN accepts no liabilities customer support and factory service, if it is required. If you experience a and is not limited to: injury to the Service Personnel, or damages to;...
Page 4
As a general policy, we do not recommend the use of any of our products in life tion and Servicing of these Battery Packs. MINUTEMAN accepts no liabilities support applications where failure or malfunction of the product can be reason- and is not limited to: injury to the Service Personnel, or damages to;...
Chapter 2: Rear Panel Chapter 3: Installation This Battery Pack series is ONLY intended to be installed in an indoor tem- perature controlled environment that is free of conductive contaminants. DO NOT operate the Battery Pack in: extremely dusty and/or unclean areas, loca- tions near heating devices, water or excessive humidity, or where the Battery Pack is exposed to direct sunlight.
Page 6
RACKMOUNT CONFIGURATION FIG. 3 The Battery Pack comes with mounting brackets and rails for the standard 19" (46.5cm) 4-post rack. The screws for mounting the Battery Pack to the rack are not included (screw size varies with rack size). 1. Mount the rails to the 4-post rack. (FIG. 1) 2.
Page 7
CONNECTING THE BATTERY PACK DAISY CHAINING (QUALIFIED SERVICE PERSONNEL ONLY) (QUALIFIED SERVICE PERSONNEL ONLY) "Daisy Chaining" means hooking one Battery Pack to another Battery Pack to NOTE: When using these Battery Packs, the UPS must be configured another Battery Pack, this chain could go on indefinitely. Follow the steps so that the UPS will report the correct estimated runtime on the LED/ below to Daisy Chain the Battery Packs.
Chapter 4: Replacing The Battery Model # BP24RTEXL BP36RTEXL BP48RTEXL BP72RTEXL (QUALIFIED SERVICE PERSONNEL ONLY) Battery Qty/Rating 20 - 12V9.0Ah 18 - 12V9.0Ah These Battery Packs have an easy to replace hot-swappable batteries. Please read all of the WARNINGS and CAUTIONS before attempting to service the CSB Part # HR 1234W F2 batteries.
Page 9
21. Remove the old batteries from the bottom half of the plastic battery tray. FIG. 3 22. Install the new batteries into the bottom half of the plastic battery tray in the same position as the original batteries. 23. Verify proper polarity. Re-install the battery jumper wires on the new batteries.
4. Mark the RMA # on the outside of all packages. The factory cannot accept any package without the RMA # marked on the outside. 5. Return the unit by insured, prepaid carrier to: Para Systems Inc. MINUTEMAN UPS 1809 W. Frankford Road, Suite 150 Carrollton, TX 75007 ATTN: RMA # _______...
Chapter 7: Limited Product Warranty Notes: Para Systems, Inc. (Para Systems) warrants this equipment, when properly applied and operated within specified conditions, against faulty materials or workmanship for a pe- riod of three years from the date of purchase. For equipment sites within the United States and Canada, this warranty covers depot repair or replacement of defective equip- ment at the discretion of Para Systems.
Need help?
Do you have a question about the Rack/Tower Extended Runtime Battery Packs and is the answer not in the manual?
Questions and answers