Joint Cementing Procedure - Lennox EL195UHE Unit Information

El195uhe series units
Table of Contents

Advertisement

Outdoor
Exhaust
VENT
Accelerator
EL195
PIPE
(Dia. X
UNIT
DIA.
Length)
(in.)
1−1/2" X 12"
2
YES
2−1/2
YES
045
3
YES
2
YES
2−1/2
YES
070
3
YES
2
2−1/2
090
3
2
110
2−1/2
3
135
3
*Requires field−provided and installed 1−1/2" exhaust accelerator.
** Kit 51W11 is provided with a 1−1/2" accelerator which must be used for all EL195UHXE−045, −070 and −090 installations.
† Termination kits 44W92, 44W93, 30G28 and 81J20 approved for use in Canadian installations to meet CSAB149.
†† The 44W92 concentric kit is provided with a 1−1/2" accelerator which must be installed on the exhaust outlet when this kit is used with the EL195UHXE04536B and
EL195UHXE070P36B furnaces.
NOTE − Standard terminations include all approved non−concentric terminations.

Joint Cementing Procedure

All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system
check. Allow fumes to dissipate for at least 5 minutes
before placing unit into operation.
1 − Measure and cut vent pipe to desired length.
2 − Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
NOTE − Check the inside of vent pipe thoroughly for
any obstruction that may alter furnace operation.
3 − Clean and dry surfaces to be joined.
4 − Test fit joint and mark depth of fitting on outside of pipe.
TABLE 9
OUTDOOR TERMINATION KITS USAGE
STANDARD
Outdoor
Exhaust
2" Wall Plate
3" Wall Plate
Accelerator
Kit
(Dia. X
Length)
22G44
2" X 12"
or 30G28†
or 81J20†
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Page 20
Flush-
2" Wall
Mount
Kit
Ring Kit
Kit
44J40
15F74
51W11**
YES*
YES
YES
YES*
YES
YES
YES*
YES
YES
YES*
YES
YES
YES*
YES
YES
YES*
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
5 − Uniformly apply a liberal coat of PVC primer for PVC or
use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
NOTE − Time is critical at this stage. Do not allow prim-
er to dry before applying cement.
6 − Promptly apply solvent cement to end of pipe and in-
side socket surface of fitting. Cement should be ap-
plied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply sec-
ond coat to end of pipe.
7 − Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn dur-
ing assembly (but not after pipe is fully inserted) to dis-
tribute cement evenly. DO NOT turn ABS or cellular
core pipe.
NOTE − Assembly should be completed within 20 sec-
onds after last application of cement. Hammer blows
should not be used when inserting pipe.
CONCENTRIC
1−1/2"
2"
3"
Concentric
Concentric
Concentric
Kit
Kit
Kit
71M80
69M29
60L46
or
or
or 44W93†
†44W92††
†44W92††
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

Advertisement

Table of Contents
loading

Table of Contents