To make sure that the system is installed correctly, do the steps that
follow:
1. Make sure that there are no leaks in the gas lines.
2. Make sure that the blower rotates in the correct direction. If
incorrect, then have a qualified electrician rewire the blower to
reverse its rotation.
3. Set the air proving switch.
4. Set the low gas pressure switch.
5. Set the high gas pressure switch.
6. Close all the burner gas cocks.
7. Trip out pressure switches and other limit interlocks. Make sure
that the main gas valves close.
Danger:
If simulated limits or simulated flame failures do
not shut down the fuel system within the required
failure response time, then immediately correct the
problem.
Eclipse Vortometric Burner v2.00, Installation Guide 248, 4/10/07

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Vortometric v2.00 and is the answer not in the manual?

Table of Contents