Fault Finding - Benchmark Alpha CD18S Installation And Servicing Instructions

Wall mounted, fan assisted, room sealed, gas fired, high efficiency condensing system boiler range
Table of Contents

Advertisement

10 FAULT FINDING

10.1 CARRY OUT INITIAL FAULT FINDING CHECKS
1.
Check that gas, water and electrical supplies are available at the boiler.
i.e. Inlet gas pressure = 20 mbar
Electrical supply = 230/240 V ~ 50 Hz
CH water system pressurised to between 0.75 and 1.25 bar
2.
Carry out electrical system checks, i.e. Earth Continuity, Resistance to Earth, Short Circuit and Polarity with a suitable meter.
Note: These checks must be repeated after any servicing or fault finding.
3.
Ensure all external controls are calling for heat and check all external and internal fuses.
4.
Check that the gas and water pipework has been connected to the correct connections on the boiler and all valves are open.
However, before any servicing or replacement of parts ensure the gas and electrical supplies are isolated.
10.2 CENTRAL HEATING - Follow operational sequence
Alpha CD18S/24S/30S - Fault Finding
31

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Alpha CD18S and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Alpha cd24sAlpha cd30s

Table of Contents