Preparing For Use; What's In The Box; Installation Site Preparations; Rack Mounting (Optional) - TANDBERG Content Server Administrator's Manual

Content server
Hide thumbs Also See for Content Server:
Table of Contents

Advertisement

Preparing for Use

What's in the Box?

To avoid damage to the unit during transportation,
the Content Server is delivered in a special
shipping box, which should contain the following
components:
CD with User Guide and other documentation.
Rack-ears and screws.
Power cable.
Ethernet cable.
TANDBERG Content Server.
Please report any discrepancies to your
TANDBERG Representative immediately.

Installation Site Preparations

Make sure the Content Server is accessible
and that all cables can be easily connected.
For ventilation: Leave a space of at least
10 cm (4 inches) behind the Content
Server's rear panel and 10 cm (4 inches) in
front of the front panel.
The room in which you install the Content
Server should have an ambient temperature
between 0 ºC and 35 ºC (32 ºF and 95 ºF)
and between 10 % and 90 % non-condensing
relative humidity.
Do not place heavy objects directly on top of
the Content Server.
Do not place hot objects directly on top, or
directly beneath the Content Server.
Use a grounded AC power outlet for the
Content Server.
Table of
Introduction
Installation
Contents
D13898.08
MAY 2009
Before starting the rack mounting please
make sure the TANDBERG Content Server
is placed securely on a hard flat surface.
Attach the brackets to the Content Server
on both sides of the unit.
Connect a LAN cable from
the
LAN 1
connector
on the Content Server
to your network.
The
LAN
2,
3
and
4
connectors are
not used and should
be left open.
TCS
Backing up and
Quick Setup
Administration
Restoring

Rack Mounting (optional)

Disconnect the AC power cable, if
applicable.
Insert the Content Server into a 19" rack, and secure with screws in the front (four screws).

Connecting Cables

Connect the AC power
cable to an electrical distribution
socket. Press the power switch
button at the back side to
turn on the Content Server.
On the front panel of the system
the power indicator LED, marked
Pwr, will light up.
Administrator
Conference
Settings
Setup
Conferences
15
TANDBERG
ADMINISTRATOR GUIDE
Make sure that the mounting space is
prepared according to the
Preparations
below left.
10 cm
1
to
View
Appendices
CONTENT SERVER
Installation Site
10 cm

Advertisement

Table of Contents
loading

Table of Contents