Combustion Chamber Insulation - Potterton Performa 9 SL HE User Manual

Performa sl he series condensing central heating boiler
Hide thumbs Also See for Performa 9 SL HE:
Table of Contents

Advertisement

9.12
9.12
Insulation assembly incorrectly
fitted
9.12
Fig. 60
48
Location lip
Insulation assembly correctly
fitted and held in location tabs
9.12 Combustion
Insulation
Important: See Section 3.1, Health and
Safety information before handling
insulation.
1. Perform General Access - See 9.2.
2. Remove the screw securing the front
combustion chamber cover. Pull the cover
out slightly then down to unhook and lift away
from the boiler.
3. Remove the Burner - See 9.10.
4. Remove the two screws securing the side
and rear insulation assembly to the front of
the chassis.
5. Pull the assembly forwards and away from
the boiler. Replace insulation pieces as
required, replace any securing clip if
damaged.
6. Re-assemble in reverse order, ensure the
insulation assembly has located correctly
over the tabs at the rear of the casing below
the casting and is NOT hanging down.
Chamber
© Baxi Heating UK Ltd 2008

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents