Printed Circuit Board) Exchange; Adjustment Volume Location; Test Point Location - Beko P7 Service Manual

Pdp tv
Hide thumbs Also See for P7:
Table of Contents

Advertisement

MD-42HM8 SERIES
8.3.
P.C.B. (Printed Circuit Board) exchange
8.3.1.
Caution
1. To remove P.C.B. , wait 1 minute after power was off for discharge from electrolysis capacitors.
8.3.2.
Quick adjustment after P.C.B. exchange
P.C.B.
P Board
SC Board
SS Board
*See the Panel label.
8.4.

Adjustment Volume Location

8.5.

Test Point Location

Name
Test Point
Vsus
TPVSUS (SS)
Vad
TPVAD (SC)
Ve
TPVE (SS)
Voltage
Volume
Vsus ± 2V
VR351 (P)
-105V ± 1V
VR6477(SC)
Ve ± 1V
VR6145 (SS)
14
Remarks
*
*

Advertisement

Table of Contents
loading

Table of Contents