Replacement Of Parts - Worcester GreenStart 25Si Instruction Manual

Wall hung rsf gas-fires condensing combination boiler for sealed central heating systems and mains fed domestic hot water
Table of Contents

Advertisement

43

REPLACEMENT OF PARTS

11
C
C
9
A
10
B
Spare Fuse order
T1.6L 250V F2
T2.5H 250V F1
T500L 250V F3
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 25Si/30Si
REPLACEMENT OF PARTS
9. Access to boiler control components
Remove 3 screws (A) and remove cover
from control.
10. PCB fuse
Remove fuse F1 (B) from the PCB and
replace.
There is a spare fuse clipped into the
underside of the electrical cover.
11.Transformer / PCB
Disconnect all electrical connections from
the control.
Remove 5 screws (D) retaining the rear
panel of the control and remove panel.
8 716 107 337b (11/05)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstart 30si

Table of Contents