Sharp SF-1014 Service Manual page 60

Table of Contents

Advertisement

6)
Without moving the scanner unit drive pulley shaft, manual-
ly turn the scanner unit drive pulley in the same side of the
loosened setscrew. When it makes contact with No.2 scan-
ner unit positioning plate, tighten and fix the setscrew.
No.2 scanner unit
Positioning plate
(Note)
Allow a clearance of about 0.5mm between the scanner
unit drive pulley and the positioning E-ring.
0.5mm
7)
Manually turn the scanner unit drive gear to bring No.2
scanner unit into contact with the positioning plate, and
perform the procedure of step 4).
Repeat procedures of steps 4) to 7) until the parallelism of
No.2 scanner unit is properly set.
8)
With No.2 scanner unit being in contact with No.2 scanner
unit positioning plate, and insert the 1.0 mm spacer be-
tween No.1 scanner unit and upper-R frame, bring No.1
scanner unit into contact with upper-R frame, and fix it to
the scanner unit drive wire.
No.1 scanner unit
Wire fixing
screw
Do not move
the shaft.
Scanner unit drive pulley
Upper-right frame
Wire fixing
screw
1.0mm spacer
Procedures 1) to 8) are for adjustment of mechanical
horizontal parallelism. No.1 scanner unit and No.2 scanner
unit are fixed to the specified positions and the mechanical
horizontal parallelism of No.2 scanner unit is adjusted.
Then the optical horizontal parallelism must be adjusted in
the following procedures.
9)
Set the image distortion check chart on the document table,
and make a reduction copy (90%) on an B4 or 14" x 8 1/2"
paper with the document cover open.
7 – 10
50mm
B4 or "11 x 14" size
paper

Advertisement

Table of Contents
loading

Table of Contents