Outdoor Unit; Install The Outdoor Unit; Connecting The Piping - Panasonic CS-V18DKE Service Manual

Air conditioner
Table of Contents

Advertisement

10.3. Outdoor Unit

10.3.1. SELECT THE BEST LOCATION
(Refer to "Select the best location" section)

10.3.2. INSTALL THE OUTDOOR UNIT

• After selecting the best location, start installation according
to Indoor/Outdoor Unit Installation Diagram.
1. Fix the unit on concrete or rigid frame firmly and horizontally
by bolt nut. (ø10 mm).
2. When installing at roof, please consider strong wind and
earthquake. Please fasten the installation stand firmly with
bolt or nails.

10.3.3. CONNECTING THE PIPING

Connecting The Piping To Indoor Unit
Please make flare after inserting flare nut (locate at joint portion
of tube assembly) onto the copper pipe. (In case of using long
piping)
Connect the piping
• Align the center of piping and sufficiently tighten the flare
nut with fingers.
• Further tighten the flare nut with torque wrench in specified
torque as stated in the table.
Connecting The Piping To Outdoor Unit
Decide piping length and then cut by using pipe cutter. Remove burrs from cut edge. Make flare after inserting the flare nut
(located at valve) onto the copper pipe.
Align center of piping to valves and then tighten with torque wrench to the specified torque as stated in the table.
CUTTING AND FLARING THE PIPING
1. Please cut using pipe cutter and then remove the burrs.
2. Remove the burrs by using reamer. If burrs is not removed, gas leakage may be caused.
Turn the piping end down to avoid the metal powder entering the pipe.
3. Please make flare after inserting the flare nut onto the copper pipes.
MODEL
V18DK, W18DK
V24DK, W24DK,
41
CS-V18DKE CU-V18DKE / CS-V24DKE CU-V24DKE
Piping size (Torque)
Gas
Liquid
1/2" (55 N.m)
1/4" (18 N.m)
5/8" (65 N.m)
1/4" (18 N.m)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs-v24dkeCu-v18dkeCu-v24dke

Table of Contents