Voltage Reduction Device (Vrd); Vrd Specification; Vrd Maintenance - Thermal Arc 250TS DC CC Operating Manual

Inverter arc welder
Table of Contents

Advertisement

10.0 VOLTAGE REDUCTION DEVICE (VRD)

10.01 VRD Specification

Description
VRD Open Circuit Voltage
VRD Resistance
VRD Turn OFF Time

10.02 VRD Maintenance

Routine inspection and testing (power source)
An inspection of the power source, an insulation resistance test and an earth resistance test
shall be carried out
a) For transportable equipment, at least once every 3 months; and
b) For fixed equipment, at least once every 12 months.
The owners of the equipment shall keep a suitable record of the periodic tests.
A transportable power source is any equipment that is not permanently connected and
fixed in the position in which it is operated.
In addition to the above tests and specifically in relation to the VRD fitted to this machine,
the following periodic tests should also be conducted by an accredited Thermal Arc service
agent.
Description
VRD Open Circuit Voltage
VRD Turn ON Resistance
VRD Turn OFF Time
If this equipment is used in a hazardous location or environments with a high risk of
electrocution then the above tests should be carried out prior to entering this location.
Pro-Wave 250TS
Open circuit voltage between welding
15.3 to 19.8V
terminals
The required resistance between welding
148 to 193 ohms
terminals to turn ON the welding power
The time taken to turn OFF the welding
0.2 to 0.3 seconds
power once the welding current has
stopped
Note 7
Less than 20V; at Vin=230V or 460V
46
Notes
IEC 60974-1 Requirements
Less than 200 ohms
Less than 0.3 seconds