The antenna and feed boom/reflector assembly incorporates self lubricating bearing
assemblies throughout its construction, eliminating the need for any additional lubrication
for the life of the antenna.
The feed system is factory precision aligned for optimum performance, moving or reposi-
tioning feed system will only reduce performance capabilities. Do not move the feed sys-
tem.
The polarization drive system does not require any periodic maintenance; however
replacement of the polarization drive chain may be necessary after extended use (usual-
ly several years).

Introduction

Periodic maintenance of the Roto-Lok ® drive normally requires only visual inspection for
misalignment or damaged cables. In the event that a cable(s) may require replacement,
the drive design incorporates sufficient clearance between the capstan and drum, allow-
ing removal and installation of individual cables. In the event the drive has become dis-
abled due to broken/tangled cables and cannot be driven safety to a stow/repair posi-
tion, the margin of safety in the drive design, will allow for a cable(s) to be removed to
enable the drive to be rotated to a safe stow/repair position for cable replacement.
Operation with less than the total number of cables is not recommended as normal oper-
ational mode, however the drive will function with reduced stiffness temporarily while
awaiting replacement cable installation.
Antenna Drive
Drive cables should be periodically checked for cable misalignment or visible damage
System Cable
that might lead to broken wires and or tangled cables. Look for frayed/broken cable
wires that might occur due to normal wear after extended lifetime, or through contact
Inspection
with foreign objects, such as hand tools during servicing of the antenna. In the event of
frayed/broken wires are discovered, they should be replaced as soon as possible to pre-
vent damage to neighboring cable assemblies.
Check cables every four weeks for the first six months of operation (cable tension,
frayed/broken wires). Thereafter, monitor cables biannually. For continuous use of anten-
na drive system, shorten the above recommended periodic interval by one half.
The rated capacity/stiffness of the Roto-Lok ® drive system is directly related to tension
within the cables configuring the azimuth and elevation drive system. Proper cable ten-
sion is essential for the antenna drive system to perform as specified. How to verify and
maintain proper cable tension is considered in the following discussion.
CAUTION!
Do Not Over Tension the Cable When Tightening the Cable Tension Adjusting
Nuts. It is Possible to Break a Cable With the Mechanical Advantage of the
Threaded End!