Andrew OM24SNG-RC Operation And Maintenance page 12

2.4-meter sng earth station antenna
Table of Contents

Advertisement

Be sure no interference is present in and around the azimuth axis opening during
antenna rotation.
Step 10
After tensioning both ends of azimuth cable assembly, rotate azimuth to limits of travel
(clockwise and counterclockwise) several times to distribute cable tension evenly.
Step 11
Recheck/verify cable tension at both ends of azimuth cable(s) in accordance with the
above recommended procedure. Repeat above cable tensioning procedure if necessary.
Step 12
If changed earlier, reset the software limits and reconfigure the hardware limits for
counter-clockwise azimuth rotation to their previous value/location. Return antenna to
stow position before relocating any hard limit actuation blocks (see section titled
Azimuth Rotational Limits for more detail).
Step 13
Verify proper software and hardware limit switch operation.
Step 14
Replace cable tension access port cover and rear rain shield.
CAUTION!
12
Maintenance

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es24sng-lte

Table of Contents