Horizontal Installations - Goodman *MVM96 Installation Instructions Manual

Modulating gas furnace
Hide thumbs Also See for *MVM96:
Table of Contents

Advertisement

LEFT
SIDE PANEL
FRONT COVER
DRAIN PORT
RED HOSE
CLAMP
HOSE A
SIDE PANEL
DRAIN
HOLES
TUBE(S) 2
DRAIN
TRAP
GREEN
HOSE CLAMP
Upright "Standard" Connections - Left Side
(Upflow Shown, Counterflow Similar)
Cabinet Width
Models
(inches)
(kBTU_Tons)
17 1/2
60_3
60_4
21
80 5
80_5
24 1/2
100_5
115_5
Drain Hose "B" Table
U
D
T
M
PRIGHT
RAIN
RAP
OUNTING
1. Insert drain tubes into drain trap and position the drain
trap against the side panel. NOTE: Drain tubes must
reach the bottom of the drain trap.
2. Secure drain trap to side panel at the mounting holes
(dimples or crosshairs on counterflow models) located
below the grommet drain holes.
3. Attach PVC drain line to drain trap outlet with either a 90°
elbow or coupling.
H
I
ORIZONTAL
NSTALLATIONS
R
S
D
IGHT
IDE
OWN
Horizontal installations with the right side down require that the
drain hoses be connected to the right side front cover drain port
and the rubber elbow drain port.
RUBBER
ELBOW
RUBBER
ELBOW
DRAIN PORT
SILVER HOSE
CLAMP
TUBE 1
GREEN HOSE
CLAMP
HOSE B
"X" Length to Cut From Long
End of Hose B
(inches)
7
3 1/2
None
(L
R
S
P
EFT OR
IGHT
IDE
ANEL
FRONT
COVER
PRESSURE
TAP
LEFT SIDE
FRONT COVER
PANEL
DRAIN PORT
RED HOSE CLAMP
Horizontal Connections - Left Side Down
(Upflow Shown, Counterflow Similar)
NOTE: On counterflow models, relocation of the front cover
pressure switch hose is required. The pressure switch hose
must be connected to the bottom port of the collector box
cover to guard against blocked drain conditions. Cut hose to
appropriate length to minimize sagging. Install the rubber plug
on the open port.
)
Make connections as follows:
1. Remove the rubber plug/cap from right side of the front
cover drain port.
2. Secure Hose A to front cover drain tap with a red hose
clamp. Route hose to rear right (down) side panel grommet
holes.
3. Cut 1/4 inch from the end of the drain port on the rubber
elbow and discard.
4. Insert Tube 1 into rubber elbow drain port and secure with
a silver hose clamp. Angle tube outward toward front of
furnace.
5. Cut 17 3/4 inches from the long end of Hose B and discard.
6. Secure remaining end of Hose B to exposed end of Tube
1 with a green hose clamp. Route hose to front right
down side panel grommet holes.
7. Cut 5 1/2 inches straight length from the long end of each
Tube 2 and discard the radius pieces.
8. Insert approximately one inch of each Tube 2 through the
right down side panel grommet holes. Secure tubes to
Hose A and Hose B using green hose clamps. Ensure
hoses and tubes maintain a downward slope for proper
drainage and are not kinked or bound.
For details concerning mounting of the drain trap, refer to Con-
densate Drain Lines and Drain Trap - Horizontal Drain Trap
Mounting.
Horizontal installations with the left side panel down will require
drain hoses to be connected to the left side front cover drain
port and the side drain port on the rubber elbow.
26
GREEN HOSE
CLAMP
HOSE B
HOSE A
GREEN HOSE
CLAMP
TUBE(S) 2
DRAIN TRAP
Allow
4-3/4" minimum
SIDE PANEL
for trap
GROMMET
HOLES

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents