Bryant 340AAV Installation, Start-Up, And Operating Instructions Manual page 12

4-way multipoise fixed-capacity condensing gas furnace
Table of Contents

Advertisement

AUXILIARY "J" BOX
CONDENSATE
TRAP
RELOCATE TUBE BETWEEN BLOWER SHELF AND INDUCER HOUSING FOR
e. Connect inducer housing drain connection to
condensate trap.
(1.) Condensate Trap Located on Left Side of Casing
a. Determine appropriate length and cut.
b. Connect tube to condensate trap.
c. Clamp tube to prevent any condensate leakage.
(2.) Condensate Trap Located on Right Side of Casing
a. Route inducer housing drain tube (violet label)
directly from inducer housing to condensate
trap as shown in Fig. 9.
b. Determine appropriate length and cut.
c. Connect tube to condensate trap.
d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section for connection
procedure.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations
and procedures.
PRESSURE SWITCH TUBING
One collector box pressure tube (pink label) is factory connected
to the pressure switch for use when furnace is installed in
UPFLOW applications. This tube MUST be disconnected and
used for the condensate trap relief port tube. The other collector
box pressure tube (green label) which was factory connected to
the condensate trap relief port connection MUST be connected to
the pressure switch in DOWNFLOW or HORIZONTAL
RIGHT applications.
NOTE: See Fig. 8 or 9 or tube routing label on main furnace
door to check for proper connections.
PLUG
CAP
COLLECTOR
BOX EXTENSION
DRAIN TUBE
COLLECTOR BOX
EXTENSION TUBE
DRAIN TUBE COUPLING
COLLECTOR BOX TUBE (PINK)
040, 060, AND 080 HEATING INPUT FURNACES
Fig. 10 - - Horizontal Left Tube Configuration
- - 12 - -
COLLECTOR BOX
DRAIN TUBE
(BLUE AND WHITE STRIPED)
COLLECTOR BOX
TUBE (GREEN)
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
DRAIN TUBE (BLUE)
Relocate tubes as described below.
1. Disconnect collector box pressure tube (pink label)
attached to pressure switch.
2. Extend collector box pressure tube (green label) which
was previously connected to condensate trap relief port
connection
by
splicing
(factory-supplied in loose parts bag).
3. Connect collector box pressure tube (green label) to
pressure switch connection labeled COLLECTOR BOX.
4. Extend collector box pressure tube (pink label) which was
previously connected to pressure switch by splicing to
remaining small diameter tube (factory-supplied in loose
parts bag).
5. Route this extended tube (pink label) to condensate trap
relief port connection.
6. Determine appropriate length, cut, and connect tube.
7. Clamp tube to relief port connection.
CONDENSATE TRAP FREEZE PROTECTION
Refer
to
Condensate
Drain
recommendations and procedures.
Step 4 - - Horizontal Left (Supply-Air Discharge)
Applications
A horizontal left furnace application is where furnace blower is
located to the right of combustion and controls section of furnace,
and conditioned air is discharged to the left.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application
location as shown in Fig. 2 or 10.
A00215
to
small
diameter
tube
Protection
section
for

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents