Download Print this page

GE RAK3153A Installation Instructions page 2

Power supply kit for cord connection with current interruption device
Hide thumbs Also See for RAK3153A:

Advertisement

FOR 230/208 VOLT POWER CORD CONNECTIONS ONLY
1. Remove the room cabinet by pulling it out at the bottom
to release it (1); then lift it up to clear the rail along the
unit top (2).
2. Insert the plug into the socket located in the wiring
compartment, making sure the plug is firmly seated
and the latches secure the connector assembly.
Strain
relief
Plug into
building
receptacle
3. Position the cord and install the strain relief and screw
as shown.
4. Reinstall the room cabinet front by positioning on the
top brackets and securing the sides to the unit.
5. Install the attachment plug cap into the wall
receptacle and check the Zoneline operation.
Yellow plug
to chassis
connector
Screw
Cord
Test the Current Interrupter
These kits include a Leakage Current Detection
Interrupter (LCDI) device. These Current Interruption (CI)
devices comply with Underwriters Laboratories (UL)
1699 and National Electrical Code (NEC), section 440.65
and are not required to function as Ground Fault Circuit
Interrupters (GFCI).
1. Set the Zoneline unit to operate in Low Fan mode and
verify operation.
2. Press the Test button. Reset button should pop out with
a click. Unit should shut down with no power.
3. If Test button does not trip and remove power from unit
when depressed, contact a qualified service technician.
4. Press the Reset button. Test button should pop out
with a click and unit should resume operation.
Due to the Random Restart feature, there is a
planned 2 to 25 second delay in the restart of
the Zoneline.
5. If unit does not operate, repeat steps 2 through 4.
6. If unit still does not operate, contact a qualified service
technician.
7. Test the current interrupter device on a periodic basis.

Advertisement

loading

This manual is also suitable for:

Rak3203aRak3303a